The Grid Podcast Por Brian Moorhead arte de portada

The Grid

The Grid

De: Brian Moorhead
Escúchala gratis

The electricity grid is at the centre of the energy transition, and our journey to net zero by 2050. This podcast from eSmart Networks is your guide to how the grid will support the biggest shift in energy usage since the 1950’s – join us for an exciting ride! Visit us on LinkedIn at https://www.linkedin.com/company/esmart-networks, find our YouTube channel at https://www.youtube.com/channel/UCm1xJpPsmcC2zrqg-6Qn-XQCopyright 2024 Brian Moorhead Economía Política y Gobierno
Episodios
  • Connection Reform: Connections Network Design Methodology (Nov 24, Part 6)
    Nov 21 2024

    After the Connection Queue is filtered by Gate 2 (see previous episode), the Connections Network Design Methodology (CNDM) sets how the Connection Queue will be re-ordered and sorted to allocate capacity and substation connection points.

    In this episode, Brian & Damian run through step-by-step how NESO plans for this to work, alongside raising some discussion points and issues that you may want to raise in your consultation response. If you want to get your head around the CNDM consultation in 20 minutes, this episode is a great way to start.

    Links to useful reference materials:

    Reform Consultation Timeline: https://esmartnetworks.co.uk/wp-content/uploads/2024/11/Ongoing-Upcoming-Industry-Consultations-esmart-Networks.png

    6-page summary doc from ESO: https://www.nationalgrideso.com/document/316446/download

    NGESO Connection Reform web page: https://www.nationalgrideso.com/industry-information/connections/connections-reform

    Capacity Crunch: State of Play in May podcast (covering why this is needed): https://youtu.be/cH0r8iC3h7Q

    Listen to the podcast here:

    Spotify: https://ow.ly/3mFo50Ubyf4

    Apple Podcast: https://ow.ly/wQIM50UbyeK

    YouTube: https://ow.ly/wGM350UbyeN

    Web Player: https://ow.ly/yGUv50UbyeP

    YouTube: https://youtu.be/M8RFUosjs_s

    Follow us on our social media channels:

    LinkedIn: https://www.linkedin.com/company/esmart-networks/

    Instagram: https://www.instagram.com/esmartnetworks

    Twitter: https://twitter.com/esmartnetworks1

    Facebook: https://www.facebook.com/eSmartNetworks

    Más Menos
    26 m
  • Connection Reform: Gate 2 Methodology (Nov 24, Part 5)
    Nov 19 2024

    Part 5 in the Connection Reform mini-series follows Part 4 by delving into the next most important Consultation: Gate 2. The Gate 2 Methodology will govern what a project needs to do to be considered for capacity and a 'firm' connection offer.

    This is essential listening for project developers, those involved in project land acquisition, and project investors who want to understand key risks to large-scale Data Centres, Solar, Battery, and other types of projects. Gate 2 is the first step in deciding the winners and losers in the connection queue.

    Links to useful reference materials:

    Reform Consultation Timeline: https://esmartnetworks.co.uk/wp-content/uploads/2024/11/Ongoing-Upcoming-Industry-Consultations-esmart-Networks.png

    6-page summary doc from ESO: https://www.nationalgrideso.com/document/316446/download

    NGESO Connection Reform web page: https://www.nationalgrideso.com/industry-information/connections/connections-reform

    Capacity Crunch: State of Play in May podcast (covering why this is needed): https://youtu.be/cH0r8iC3h7Q

    Listen to the podcast here:

    Spotify: https://ow.ly/pokq50U9KlW

    Apple Podcast: https://ow.ly/j2BY50U9KlT

    YouTube: https://ow.ly/gtFn50U9KlU

    Web Player: https://ow.ly/nThq50U9KlS

    Follow us on our social media channels:

    LinkedIn: https://www.linkedin.com/company/esmart-networks/

    Instagram: https://www.instagram.com/esmartnetworks

    Twitter: https://twitter.com/esmartnetworks1

    Facebook: https://www.facebook.com/eSmartNetworks

    Más Menos
    24 m
  • Connection Reform: The Big Updates - New Consultations Released (Nov 24, Part 4)
    Nov 15 2024

    With a deluge of consultations and documents having just been released covering a lot more detail on how getting connected to the grid will change, Brian & Damian provide a high-level summary of all of the current consultations, what they cover, how they interlink and most importantly key deadlines.

    They then delve into the first consultation to close, CMP434, which sets the high-level framework for connection reform. This episode provides anyone with a good starting point on Connection reform and will help you make sense of everything that's going on.

    Links to useful reference materials:

    Reform Consultation Timeline: https://esmartnetworks.co.uk/wp-content/uploads/2024/11/Ongoing-Upcoming-Industry-Consultations-esmart-Networks.png

    6-page summary doc from ESO: https://www.nationalgrideso.com/document/316446/download

    NGESO Connection Reform web page: https://www.nationalgrideso.com/industry-information/connections/connections-reform

    Capacity Crunch: State of Play in May podcast (covering why this is needed): https://youtu.be/cH0r8iC3h7Q

    Listen to the podcast here:

    Spotify: https://open.spotify.com/episode/7dcNXoW21ahJa2LqrXM6jr?si=iKqrvOnHTqqjEQtFYQRySw

    Apple Podcast: https://podcasts.apple.com/gb/podcast/connection-reform-the-big-updates-new-consultations/id1609969567?i=1000677056077

    Web Player: https://esmartnetworks-the-grid.captivate.fm/episode/connection-reform-the-big-updates-new-consultations-released-nov-24-part-4-

    Follow us on our social media channels:

    LinkedIn: https://www.linkedin.com/company/esmart-networks/

    Instagram: https://www.instagram.com/esmartnetworks

    Twitter: https://twitter.com/esmartnetworks1

    Facebook: https://www.facebook.com/eSmartNetworks

    Más Menos
    25 m
Todavía no hay opiniones