-
Critical Path
- Narrado por: Alister Austin
- Duración: 15 h y 47 m
No se pudo agregar al carrito
Add to Cart failed.
Error al Agregar a Lista de Deseos.
Error al eliminar de la lista de deseos.
Error al añadir a tu biblioteca
Error al seguir el podcast
Error al dejar de seguir el podcast
Compra ahora por US$21.49
No default payment method selected.
We are sorry. We are not allowed to sell this product with the selected payment method
Los oyentes también disfrutaron...
-
Inventor of the Future
- The Visionary Life of Buckminster Fuller
- De: Alec Nevala-Lee
- Narrado por: Rob Shapiro
- Duración: 18 h y 4 m
- Versión completa
-
General
-
Narración:
-
Historia
During his lifetime, Buckminster Fuller was hailed as one of the greatest geniuses of the twentieth century. As the architectural designer and futurist best known for the geodesic dome, he enthralled a vast popular audience, inspired devotion from both the counterculture and the establishment, and was praised as a modern Leonardo da Vinci. To his admirers, he exemplified what one man could accomplish by approaching urgent design problems using a radically unconventional set of strategies, which he based on a mystical conception of the universe’s geometry.
-
-
I learned much about Buckminster Fuller!
- De Richard J. Chandler en 09-12-22
De: Alec Nevala-Lee
-
Second Chance
- for Your Money, Your Life and Our World
- De: Robert T. Kiyosaki
- Narrado por: Tim Wheeler
- Duración: 9 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
Few would argue with the fact that on many fronts, we are a world in crisis. And there are two sides to every crisis, be it a leadership crisis, an economic crisis, an education crisis, or a moral crisis. The two sides to crisis are danger and opportunity. Robert Kiyosaki's new book, Second Chance: for Your Money and Your Life, uses the lessons from the past and a brutal assessment of the present to prepare listeners to see - and seize - the future.
-
-
Err... Not impressed.
- De Robert en 07-20-15
-
Currency Wars
- The Making of the Next Global Crises
- De: James Rickards
- Narrado por: Walter Dixon
- Duración: 9 h y 52 m
- Versión completa
-
General
-
Narración:
-
Historia
In 1971, President Nixon imposed national price controls and took the United States off the gold standard, an extreme measure intended to end an ongoing currency war that had destroyed faith in the U.S. dollar. Today we are engaged in a new currency war, and this time the consequences will be far worse than those that confronted Nixon. Currency wars are one of the most destructive and feared outcomes in international economics.
-
-
don't be misled
- De peter en 04-01-12
De: James Rickards
-
The Creative Act
- A Way of Being
- De: Rick Rubin
- Narrado por: Rick Rubin
- Duración: 5 h y 45 m
- Versión completa
-
General
-
Narración:
-
Historia
Many famed music producers are known for a particular sound that has its day. Rick Rubin is known for something else: creating a space where artists of all different genres and traditions can home in on who they really are and what they really offer. He has made a practice of helping people transcend their self-imposed expectations in order to reconnect with a state of innocence from which the surprising becomes inevitable. Over the years, he has learned that being an artist isn’t about your specific output, it’s about your relationship to the world.
-
-
Rick is Art
- De Ira Henke en 01-17-23
De: Rick Rubin
-
Principles for Dealing with the Changing World Order
- Why Nations Succeed or Fail
- De: Ray Dalio
- Narrado por: Jeremy Bobb, Ray Dalio
- Duración: 16 h y 48 m
- Versión completa
-
General
-
Narración:
-
Historia
From legendary investor Ray Dalio, author of the number-one New York Times best seller Principles, who has spent half a century studying global economies and markets, Principles for Dealing with the Changing World Order examines history’s most turbulent economic and political periods to reveal why the times ahead will likely be radically different from those we’ve experienced in our lifetimes - and to offer practical advice on how to navigate them well.
-
-
Ray Dalio, Chinas New Minister of Propoganda
- De Dudley en 01-04-22
De: Ray Dalio
-
The Creature from Jekyll Island
- A Second Look at the Federal Reserve
- De: G. Edward Griffin
- Narrado por: Mark Bramhall
- Duración: 24 h y 21 m
- Versión completa
-
General
-
Narración:
-
Historia
This classic expose of the Fed has become one of the best-selling books in its category of all time. Where does money come from? Where does it go? Who makes it? The money magician's secrets are unveiled. Here is a close look at their mirrors and smoke machines, the pulleys, cogs, and wheels that create the grand illusion called money. A boring subject? Just wait. You'll be hooked in five minutes. It reads like a detective story - which it really is, but it's all true.
-
-
Lost confidence in author
- De Amazon Customer en 07-11-20
-
Inventor of the Future
- The Visionary Life of Buckminster Fuller
- De: Alec Nevala-Lee
- Narrado por: Rob Shapiro
- Duración: 18 h y 4 m
- Versión completa
-
General
-
Narración:
-
Historia
During his lifetime, Buckminster Fuller was hailed as one of the greatest geniuses of the twentieth century. As the architectural designer and futurist best known for the geodesic dome, he enthralled a vast popular audience, inspired devotion from both the counterculture and the establishment, and was praised as a modern Leonardo da Vinci. To his admirers, he exemplified what one man could accomplish by approaching urgent design problems using a radically unconventional set of strategies, which he based on a mystical conception of the universe’s geometry.
-
-
I learned much about Buckminster Fuller!
- De Richard J. Chandler en 09-12-22
De: Alec Nevala-Lee
-
Second Chance
- for Your Money, Your Life and Our World
- De: Robert T. Kiyosaki
- Narrado por: Tim Wheeler
- Duración: 9 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
Few would argue with the fact that on many fronts, we are a world in crisis. And there are two sides to every crisis, be it a leadership crisis, an economic crisis, an education crisis, or a moral crisis. The two sides to crisis are danger and opportunity. Robert Kiyosaki's new book, Second Chance: for Your Money and Your Life, uses the lessons from the past and a brutal assessment of the present to prepare listeners to see - and seize - the future.
-
-
Err... Not impressed.
- De Robert en 07-20-15
-
Currency Wars
- The Making of the Next Global Crises
- De: James Rickards
- Narrado por: Walter Dixon
- Duración: 9 h y 52 m
- Versión completa
-
General
-
Narración:
-
Historia
In 1971, President Nixon imposed national price controls and took the United States off the gold standard, an extreme measure intended to end an ongoing currency war that had destroyed faith in the U.S. dollar. Today we are engaged in a new currency war, and this time the consequences will be far worse than those that confronted Nixon. Currency wars are one of the most destructive and feared outcomes in international economics.
-
-
don't be misled
- De peter en 04-01-12
De: James Rickards
-
The Creative Act
- A Way of Being
- De: Rick Rubin
- Narrado por: Rick Rubin
- Duración: 5 h y 45 m
- Versión completa
-
General
-
Narración:
-
Historia
Many famed music producers are known for a particular sound that has its day. Rick Rubin is known for something else: creating a space where artists of all different genres and traditions can home in on who they really are and what they really offer. He has made a practice of helping people transcend their self-imposed expectations in order to reconnect with a state of innocence from which the surprising becomes inevitable. Over the years, he has learned that being an artist isn’t about your specific output, it’s about your relationship to the world.
-
-
Rick is Art
- De Ira Henke en 01-17-23
De: Rick Rubin
-
Principles for Dealing with the Changing World Order
- Why Nations Succeed or Fail
- De: Ray Dalio
- Narrado por: Jeremy Bobb, Ray Dalio
- Duración: 16 h y 48 m
- Versión completa
-
General
-
Narración:
-
Historia
From legendary investor Ray Dalio, author of the number-one New York Times best seller Principles, who has spent half a century studying global economies and markets, Principles for Dealing with the Changing World Order examines history’s most turbulent economic and political periods to reveal why the times ahead will likely be radically different from those we’ve experienced in our lifetimes - and to offer practical advice on how to navigate them well.
-
-
Ray Dalio, Chinas New Minister of Propoganda
- De Dudley en 01-04-22
De: Ray Dalio
-
The Creature from Jekyll Island
- A Second Look at the Federal Reserve
- De: G. Edward Griffin
- Narrado por: Mark Bramhall
- Duración: 24 h y 21 m
- Versión completa
-
General
-
Narración:
-
Historia
This classic expose of the Fed has become one of the best-selling books in its category of all time. Where does money come from? Where does it go? Who makes it? The money magician's secrets are unveiled. Here is a close look at their mirrors and smoke machines, the pulleys, cogs, and wheels that create the grand illusion called money. A boring subject? Just wait. You'll be hooked in five minutes. It reads like a detective story - which it really is, but it's all true.
-
-
Lost confidence in author
- De Amazon Customer en 07-11-20
-
A Pattern Language: Towns, Buildings, Construction
- Center for Environmental Structure Series
- De: Christopher Alexander
- Narrado por: Mike Fraser
- Duración: 29 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
You can use this book to design a house for yourself with your family; you can use it to work with your neighbors to improve your town and neighborhood; you can use it to design an office, a workshop, or a public building. And you can use it to guide you in the actual process of construction.
-
-
Life changing
- De abdelrahmanazmi en 08-29-22
-
FAKE
- Fake Money, Fake Teachers, Fake Assets: How Lies Are Making the Poor and Middle Class Poorer
- De: Robert T. Kiyosaki
- Narrado por: William LeRoy
- Duración: 12 h y 43 m
- Versión completa
-
General
-
Narración:
-
Historia
Robert Kiyosaki - author of the #1 personal finance book of all time - has built a legacy around simplifying complex and often-confusing subjects like money and investing. He continues to challenge conventional wisdom and asks the questions that will help listeners sift through today's information overload to uncover ways to assess what's real... and what isn't. And use truth and facts as a foundation for taking control of their financial lives. In this new book, Robert fights what’s "fake" and helps listeners differentiate between what’s real...and what isn’t.
-
-
Light on the Peanut Butter Heavy on the Crust!
- De Amazon Customer en 05-31-19
-
The Master and His Emissary
- The Divided Brain and the Making of the Western World
- De: Iain McGilchrist
- Narrado por: Dennis Kleinman
- Duración: 27 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
This pioneering account sets out to understand the structure of the human brain - the place where mind meets matter. Until recently, the left hemisphere of our brain has been seen as the "rational" side, the superior partner to the right. But is this distinction true? Drawing on a vast body of experimental research, Iain McGilchrist argues while our left brain makes for a wonderful servant, it is a very poor master.
-
-
The Master and His Emissary
- De Michael en 11-07-20
De: Iain McGilchrist
-
The Fourth Industrial Revolution
- De: Klaus Schwab
- Narrado por: Nicholas Guy Smith
- Duración: 5 h y 32 m
- Versión completa
-
General
-
Narración:
-
Historia
World-renowned economist Klaus Schwab, founder and executive chairman of the World Economic Forum, explains that we have an opportunity to shape the fourth industrial revolution, which will fundamentally alter how we live and work.
-
-
Friendly reminding : On August 15th, 1971, the dec
- De steve white en 03-24-21
De: Klaus Schwab
-
Where Is My Flying Car?
- De: J. Storrs Hall
- Narrado por: Jonathan Todd Ross
- Duración: 14 h y 1 m
- Versión completa
-
General
-
Narración:
-
Historia
The science fiction of the 1960s promised us a future remade by technological innovation: We’d vacation in geodesic domes on Mars, have meaningful conversations with computers, and drop our children off at school in flying cars. Fast-forward 60 years and we’re still stuck in traffic in gas-guzzling sedans and boarding the same types of planes we flew in over half a century ago. What happened to the future we were promised? In Where Is My Flying Car?, J. Storrs Hall sets out to answer this deceptively simple question.
-
-
More than just flying cars
- De Daniel Fudge en 09-10-23
De: J. Storrs Hall
-
Cosmic Trigger II: Down to Earth
- De: Robert Anton Wilson
- Narrado por: Oliver Senton
- Duración: 7 h y 55 m
- Versión completa
-
General
-
Narración:
-
Historia
Volume Two of the series presents the metaphor of the Bridge and the lessons of Bob’s early life that brought him to the wisdom of the Model Agnostic’s perspective. In Bob’s typical wide-ranging narratives, we learn, among other mind-blowing anecdotes, about the similarities between the Pope of Rome and the Wizard of Oz. Don’t miss this explosion of thought, when for the second time, Bob pulls the Cosmic Trigger.
-
-
Huge RAW Fan
- De Qabick en 07-03-20
-
The Case Against Reality
- Why Evolution Hid the Truth from Our Eyes
- De: Donald Hoffman
- Narrado por: Timothy Andrés Pabon
- Duración: 8 h y 43 m
- Versión completa
-
General
-
Narración:
-
Historia
Challenging leading scientific theories that claim that our senses report back objective reality, cognitive scientist Donald Hoffman argues that while we should take our perceptions seriously, we should not take them literally. How can it be possible that the world we see is not objective reality? And how can our senses be useful if they are not communicating the truth? Hoffman grapples with these questions and more over the course of this eye-opening work.
-
-
Don't buy - visual examples missing, no pdf
- De Richard Pickett en 08-26-19
De: Donald Hoffman
-
A Brief History of Everything
- De: Ken Wilber
- Narrado por: Steve Grad, Willow Pearson
- Duración: 5 h y 44 m
- Versión completa
-
General
-
Narración:
-
Historia
A Brief History of Everything is an altogether friendly and accessible account of men and women's place in a universe of sex, soul, and spirit, by Ken Wilber. Wilber examines the course of evolution as the unfolding manifestation of Spirit, from matter to life to mind, including the higher stages of spiritual development where Spirit becomes conscious of itself. In each of these domains, there are recurring patterns, and by looking at them, we can learn much about the predicament of our world - and the direction we must take if "global transformation" is to become a reality.
-
-
Embodied self-organized integration
- De Malachi Gillihan en 11-02-18
De: Ken Wilber
-
Reality, Art and Illusion
- De: Alan Watts
- Narrado por: Alan Watts
- Duración: 3 h y 30 m
- Grabación Original
-
General
-
Narración:
-
Historia
Alan Watts discusses the Indian philosophy of the world as maya - under its multiple meanings as illusion, art, magic, creative power, measure, etc. Various techniques in the arts are used to illustrate the delicate and vibrational character of the material world, and to suggest a new approach to the old philosophy that the universe is "mind" only.
-
-
Amazing
- De Jonathan en 01-21-15
De: Alan Watts
-
Value-Based Fees (3rd Edition)
- How to Charge What You're Worth and Get What You Charge
- De: Alan Weiss
- Narrado por: Alan Weiss
- Duración: 7 h y 29 m
- Versión completa
-
General
-
Narración:
-
Historia
In the newly revised third edition of Value-Based Fees: How to Charge What You're Worth and Get What You Charge, best-selling author, speaker, and renowned consultant Dr. Alan Weiss delivers a thoroughly updated guide to proposing, and receiving, consistently high fees that are based on the value you deliver to each client you serve. The author walks you through the many reasons that time-and-materials pricing models are outdated and inadequate and how to convert existing clients to your new value-based fee model.
-
-
High quality book. Missing PDFs on purchase.
- De Antonio M. Garcia en 06-24-23
De: Alan Weiss
-
Cosmic Trigger III
- My Life After Death
- De: Robert Anton Wilson
- Narrado por: Oliver Senton
- Duración: 7 h y 41 m
- Versión completa
-
General
-
Narración:
-
Historia
The first volume of the Cosmic Trigger series describes in vivid elucidation the perils of a spiritual journey. Volume two of the series presents the author’s “bridge”—how Bob grew into his expanded perspective of the Multiverse. In this third and final volume, Bob digs even deeper and uncovers the masks of reality and the reality of masks. Warning: This book may reveal more about what is "real" in reality than you might find comfortable!
-
-
Excellent narrator!
- De MC en 07-27-22
-
Aftermath
- Seven Secrets of Wealth Preservation in the Coming Chaos
- De: James Rickards
- Narrado por: James Rickards
- Duración: 10 h y 8 m
- Versión completa
-
General
-
Narración:
-
Historia
What goes up, must come down. As any student of financial history knows, the dizzying heights of the stock market can't continue indefinitely - especially since asset prices have been artificially inflated by investor optimism around the Trump administration, ruinously low interest rates, and the infiltration of behavioral economics into our financial lives. The elites are prepared, but what's the average investor to do?
-
-
Same old Jim
- De Phoenician en 07-27-19
De: James Rickards
Resumen del Editor
R. Buckminster Fuller is regarded as one of the most important figures of the 20th century, renowned for his achievements as an inventor, designer, architect, philosopher, mathematician, and dogged individualist. Perhaps best remembered for the Geodesic Dome and the term "Spaceship Earth", his work and his writings have had a profound impact on modern life and thought.
Critical Path is Fuller's master work - the summing up of a lifetime's thought and concern - as urgent and relevant as it was upon its first publication in 1981. Critical Path details how humanity found itself in its current situation - at the limits of the planet's natural resources and facing political, economic, environmental, and ethical crises.
The crowning achievement of an extraordinary career, Critical Path offers the listener the excitement of understanding the essential dilemmas of our time and how responsible citizens can rise to meet this ultimate challenge to our future.
Más títulos del mismo
Relacionado con este tema
-
Smaller Faster Lighter Denser Cheaper
- How Innovation Keeps Proving the Catastrophists Wrong
- De: Robert Bryce
- Narrado por: Steven Menasche
- Duración: 9 h y 21 m
- Versión completa
-
General
-
Narración:
-
Historia
In this provocative and optimistic rebuke to the catastrophists, Robert Bryce shows how innovation and the inexorable human desire to make things Smaller Faster Lighter Denser Cheaper is providing consumers with Cheaper and more abundant energy, Faster computing, Lighter vehicles, and myriad other goods. That same desire is fostering unprecedented prosperity, greater liberty, and yes, better environmental protection.
-
-
I thought I was getting a book on the future.
- De Grant en 08-02-14
De: Robert Bryce
-
Beyond
- Our Future in Space
- De: Chris Impey
- Narrado por: Julie McKay
- Duración: 9 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
Beyond dares to imagine a fantastic future for humans in space - and then reminds us that we're already there. Human exploration has been an unceasing engine of technological progress, from the first homo sapiens to leave our African cradle to a future in which mankind promises to settle another world. Beyond tells the epic story of humanity leaving home - and how humans will soon thrive in the vast universe beyond the Earth.
-
-
OTHER WORLDS
- De chetyarbrough.blog en 01-10-16
De: Chris Impey
-
You Belong to the Universe
- Buckminster Fuller and the Future
- De: Jonathon Keats
- Narrado por: Josh Bloomberg
- Duración: 5 h y 20 m
- Versión completa
-
General
-
Narración:
-
Historia
A self-professed "comprehensive anticipatory design scientist", the inventor Buckminster Fuller (1895-1983) was undoubtedly a visionary. Fuller's creations often bordered on the realm of science fiction, ranging from the freestanding geodesic dome to the three-wheel Dymaxion car to a bathroom requiring neither plumbing nor sewage. Yet in spite of his brilliant mind and lifelong devotion to serving mankind, Fuller's expansive ideas were often dismissed, and have faded from public memory since his death.
-
-
Bucky, Bucky, Bucky
- De Amazon Customer en 08-25-18
De: Jonathon Keats
-
The Most Powerful Idea in the World
- A Story of Steam, Industry, and Invention
- De: William Rosen
- Narrado por: Michael Prichard
- Duración: 13 h y 30 m
- Versión completa
-
General
-
Narración:
-
Historia
Award-winning author William Rosen tells the story of the men responsible for the Industrial Revolution and the machine that drove it: the steam engine.
-
-
A Revelation about a Revolution
- De Roy en 08-01-10
De: William Rosen
-
On the Future
- Prospects for Humanity
- De: Martin Rees
- Narrado por: Martin Rees, Samuel West
- Duración: 5 h y 26 m
- Versión completa
-
General
-
Narración:
-
Historia
Humanity has reached a critical moment. Our world is unsettled and rapidly changing, and we face existential risks over the next century. Various outcomes - good and bad - are possible. Yet our approach to the future is characterized by short-term thinking, polarizing debates, alarmist rhetoric, and pessimism. In this short, exhilarating book, renowned scientist and best-selling author Martin Rees argues that humanity’s prospects depend on our taking a very different approach to planning for tomorrow.
-
-
Science, the future, and great wisdom
- De Philomath en 10-29-18
De: Martin Rees
-
The Vanishing Face of Gaia
- A Final Warning
- De: James Lovelock
- Narrado por: Simon Vance
- Duración: 6 h y 38 m
- Versión completa
-
General
-
Narración:
-
Historia
In The Vanishing Face of Gaia, British scientist James Lovelock predicts global warming will lead to a Hot Epoch. Lovelock is best known for formulating the controversial Gaia theory in the 1970s, with Ruth Margulis of the University of Massachusetts, which states that organisms interact with and regulate Earth's surface and atmosphere. We ignore this interaction at our peril.
-
-
A New Perspective - A Must Listen - Very Moving
- De Thomas en 01-29-12
De: James Lovelock
-
Smaller Faster Lighter Denser Cheaper
- How Innovation Keeps Proving the Catastrophists Wrong
- De: Robert Bryce
- Narrado por: Steven Menasche
- Duración: 9 h y 21 m
- Versión completa
-
General
-
Narración:
-
Historia
In this provocative and optimistic rebuke to the catastrophists, Robert Bryce shows how innovation and the inexorable human desire to make things Smaller Faster Lighter Denser Cheaper is providing consumers with Cheaper and more abundant energy, Faster computing, Lighter vehicles, and myriad other goods. That same desire is fostering unprecedented prosperity, greater liberty, and yes, better environmental protection.
-
-
I thought I was getting a book on the future.
- De Grant en 08-02-14
De: Robert Bryce
-
Beyond
- Our Future in Space
- De: Chris Impey
- Narrado por: Julie McKay
- Duración: 9 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
Beyond dares to imagine a fantastic future for humans in space - and then reminds us that we're already there. Human exploration has been an unceasing engine of technological progress, from the first homo sapiens to leave our African cradle to a future in which mankind promises to settle another world. Beyond tells the epic story of humanity leaving home - and how humans will soon thrive in the vast universe beyond the Earth.
-
-
OTHER WORLDS
- De chetyarbrough.blog en 01-10-16
De: Chris Impey
-
You Belong to the Universe
- Buckminster Fuller and the Future
- De: Jonathon Keats
- Narrado por: Josh Bloomberg
- Duración: 5 h y 20 m
- Versión completa
-
General
-
Narración:
-
Historia
A self-professed "comprehensive anticipatory design scientist", the inventor Buckminster Fuller (1895-1983) was undoubtedly a visionary. Fuller's creations often bordered on the realm of science fiction, ranging from the freestanding geodesic dome to the three-wheel Dymaxion car to a bathroom requiring neither plumbing nor sewage. Yet in spite of his brilliant mind and lifelong devotion to serving mankind, Fuller's expansive ideas were often dismissed, and have faded from public memory since his death.
-
-
Bucky, Bucky, Bucky
- De Amazon Customer en 08-25-18
De: Jonathon Keats
-
The Most Powerful Idea in the World
- A Story of Steam, Industry, and Invention
- De: William Rosen
- Narrado por: Michael Prichard
- Duración: 13 h y 30 m
- Versión completa
-
General
-
Narración:
-
Historia
Award-winning author William Rosen tells the story of the men responsible for the Industrial Revolution and the machine that drove it: the steam engine.
-
-
A Revelation about a Revolution
- De Roy en 08-01-10
De: William Rosen
-
On the Future
- Prospects for Humanity
- De: Martin Rees
- Narrado por: Martin Rees, Samuel West
- Duración: 5 h y 26 m
- Versión completa
-
General
-
Narración:
-
Historia
Humanity has reached a critical moment. Our world is unsettled and rapidly changing, and we face existential risks over the next century. Various outcomes - good and bad - are possible. Yet our approach to the future is characterized by short-term thinking, polarizing debates, alarmist rhetoric, and pessimism. In this short, exhilarating book, renowned scientist and best-selling author Martin Rees argues that humanity’s prospects depend on our taking a very different approach to planning for tomorrow.
-
-
Science, the future, and great wisdom
- De Philomath en 10-29-18
De: Martin Rees
-
The Vanishing Face of Gaia
- A Final Warning
- De: James Lovelock
- Narrado por: Simon Vance
- Duración: 6 h y 38 m
- Versión completa
-
General
-
Narración:
-
Historia
In The Vanishing Face of Gaia, British scientist James Lovelock predicts global warming will lead to a Hot Epoch. Lovelock is best known for formulating the controversial Gaia theory in the 1970s, with Ruth Margulis of the University of Massachusetts, which states that organisms interact with and regulate Earth's surface and atmosphere. We ignore this interaction at our peril.
-
-
A New Perspective - A Must Listen - Very Moving
- De Thomas en 01-29-12
De: James Lovelock
-
The Enlightenment and Industrial Revolution
- A Captivating Guide to the Age of Reason and a Period of Major Industrialization
- De: Captivating History
- Narrado por: Jason Zenobia
- Duración: 7 h y 31 m
- Versión completa
-
General
-
Narración:
-
Historia
If you want to discover the captivating history of the Enlightenment and Industrial Revolution, then this two-in-one books bundle is for you. Includes: Age of Enlightenment and The Industrial Revolution.
-
-
Great overview of the subject
- De Vanimal en 09-20-23
-
The Case for Mars
- The Plan to Settle the Red Planet and Why We Must
- De: Robert Zubrin, Richard Wagner, Arthur C. Clarke - Foreword
- Narrado por: Sean Runnette
- Duración: 14 h y 31 m
- Versión completa
-
General
-
Narración:
-
Historia
Since the beginning of human history Mars has been an alluring dream - the stuff of legends, gods, and mystery. The planet most like ours, it has still been thought impossible to reach, let alone explore and inhabit. Now with the advent of a revolutionary new plan, all this has changed. Leading space exploration authority Robert Zubrin has crafted a daring new blueprint, Mars Direct, presented here with engaging anecdotes. The Case for Mars is not a vision for the far future or one that will cost us impossible billions.
-
-
Compelling
- De Michael D. Busch en 04-16-18
De: Robert Zubrin, y otros
-
Space Chronicles
- Facing the Ultimate Frontier
- De: Neil deGrasse Tyson
- Narrado por: Mirron Willis
- Duración: 10 h y 46 m
- Versión completa
-
General
-
Narración:
-
Historia
With his signature wit and thought-provoking insights, Neil deGrasse Tyson - one of our foremost thinkers on all things space - illuminates the past, present, and future of space exploration and brilliantly reminds us why NASA matters now as much as ever. As Tyson reveals, exploring the space frontier can profoundly enrich many aspects of our daily lives, from education systems and the economy to national security and morale.
-
-
The least helpful review of Space Chronicles.
- De Joshua Kring en 06-17-15
-
Age of Discovery
- Navigating the Risks and Rewards of Our New Renaissance
- De: Ian Goldin, Chris Kutarna
- Narrado por: Mark Meadows
- Duración: 11 h y 49 m
- Versión completa
-
General
-
Narración:
-
Historia
Age of Discovery explores a world on the brink of a new Renaissance and asks: how do we share more widely the benefits of unprecedented progress? How do we endure the inevitable tumult generated by accelerating change? How do we each thrive through this tangled, uncertain time? From gains in health, education, wealth and technology to crises of conflict, disease and mass migration, the similarities between today's world and that of the 15th century are both striking and prophetic: we have been here before.
-
-
A monotonous text disguised as casual reading.
- De Rob en 07-29-16
De: Ian Goldin, y otros
-
Mars Direct
- Space Exploration, the Red Planet, and the Human Future
- De: Robert Zubrin
- Narrado por: Erik Synnestvedt
- Duración: 1 h y 27 m
- Versión completa
-
General
-
Narración:
-
Historia
The human race is at a crossroads. In the coming years, we will make decisions regarding our human spaceflight program that will lead to one of two familiar futures: the open universe of Star Trek, where we allow ourselves the opportunity to spread our wings and attempt to flourish as an interplanetary species - or the closed, dystopian, and ultimately self-destructive world of Soylent Green. If we ever hope to live in the future that is the former scenario, our first stepping stone must be a manned mission to Mars.
-
-
Not what i thought it was going to be..
- De DUDE en 05-07-13
De: Robert Zubrin
-
Beyond the Known
- How Exploration Created the Modern World and Will Take Us to the Stars
- De: Andrew Rader
- Narrado por: Andrew Rader
- Duración: 11 h y 14 m
- Versión completa
-
General
-
Narración:
-
Historia
For the first time in history, the human species has the technology to destroy itself. But having developed that power, humans are also able to leave Earth and voyage into the vastness of space. After millions of years of evolution, we’ve arrived at the point where we can settle other worlds and begin the process of becoming multi-planetary. How did we get here? What does the future hold for us?
-
-
Loved it!
- De Ann Wellington en 11-14-19
De: Andrew Rader
-
The Last Hours of Ancient Sunlight: Revised and Updated
- The Fate of the World and What We Can Do Before It's Too Late
- De: Thom Hartmann, Neale Donald Walsch - associate editor
- Narrado por: Paul Boehmer
- Duración: 18 h y 2 m
- Versión completa
-
General
-
Narración:
-
Historia
While everything appears to be collapsing around us - ecodamage, genetic engineering, virulent diseases, water shortages, global famine, wars - we can still do something about it and create a world that will work for us and for our children's children. The inspiration for Leonardo DiCaprio's feature documentary movie The 11th Hour, The Last Hours of Ancient Sunlight details what is happening to our planet, the reasons for our culture's blind behavior, and how we can fix the problem.
-
-
One of the Most Important Books of our Time
- De Jana en 04-24-20
De: Thom Hartmann, y otros
-
To Rule the Waves
- How Control of the World's Oceans Determines the Fate of the Superpowers
- De: Bruce Jones
- Narrado por: Jacques Roy
- Duración: 12 h y 15 m
- Versión completa
-
General
-
Narración:
-
Historia
For centuries, oceans were the chessboard on which empires battled for supremacy. But in the nuclear age, air power and missile systems dominated our worries about security, and for the United States, the economy was largely driven by domestic production, with trucking and railways that crisscrossed the continent serving as the primary modes of commercial transit.
-
-
Eye opener of how the seas impact today
- De Thomas VandeVanter en 03-11-23
De: Bruce Jones
-
Simply Electrifying
- The Technology That Transformed the World, from Benjamin Franklin to Elon Musk
- De: Craig R. Roach
- Narrado por: Tom Perkins
- Duración: 15 h y 1 m
- Versión completa
-
General
-
Narración:
-
Historia
Simply Electrifying: The Technology That Transformed the World, from Benjamin Franklin to Elon Musk brings to life the 250-year history of electricity through the stories of the men and women who used it to transform our world: Benjamin Franklin, James Watt, Michael Faraday, Samuel F.B. Morse, Thomas Edison, Samuel Insull, Albert Einstein, Rachel Carson, Elon Musk, and more. In the process, it reveals for the first time the complete, thrilling, and often dangerous story of electricity's historic discovery, development, and worldwide application.
-
-
decent, but ended up disappointing.
- De Alexander Douglass en 12-28-18
De: Craig R. Roach
-
The Third Industrial Revolution
- How Lateral Power Is Transforming Energy, the Economy, and the World
- De: Jeremy Rifkin
- Narrado por: Kevin Foley
- Duración: 12 h y 23 m
- Versión completa
-
General
-
Narración:
-
Historia
Author Jeremy Rifkin presents an insider's account of the next great economic era: the Third Industrial Revolution, when a new ethic of sustainability will revolutionize the world we live in.
-
-
Lamenting "The Third Industrial Revolution"
- De Joshua Kim en 05-01-12
De: Jeremy Rifkin
-
End Times
- A Brief Guide to the End of the World
- De: Bryan Walsh
- Narrado por: Bryan Walsh, Corey Carthew
- Duración: 12 h y 29 m
- Versión completa
-
General
-
Narración:
-
Historia
End Times is a compelling work of skilled reportage that peels back the layers of complexity around the unthinkable - and inevitable - end of humankind. From asteroids and artificial intelligence to volcanic supereruption to nuclear war, veteran science reporter and TIME editor Bryan Walsh provides a stunning panoramic view of the most catastrophic threats to the human race.
-
-
Important topic ruined by needless political blather
- De J. Gordon en 08-29-19
De: Bryan Walsh
-
The Great Oil Conspiracy
- How the U.S. Government Hid the Nazi Discovery of Abiotic Oil from the American People
- De: Jerome R. Corsi
- Narrado por: Fleet Cooper
- Duración: 3 h y 22 m
- Versión completa
-
General
-
Narración:
-
Historia
At the end of World War II, U.S. intelligence agents confiscated thousands of Nazi documents on what was known as the “Fischer-Tropsch Process” - a series of equations developed by German chemists unlocking the secrets of how oil is formed. When the Nazis took power, Germany had resolved to develop enough synthetic oil to wage war successfully, even without abundant national oil reserves.
-
-
Complete and total waste of time
- De Dustin en 07-25-14
De: Jerome R. Corsi
Las personas que vieron esto también vieron...
-
Grunch of Giants
- De: R. Buckminster Fuller
- Narrado por: Andrew Heyl
- Duración: 3 h y 25 m
- Versión completa
-
General
-
Narración:
-
Historia
With the appearance of Grunch of Giants, R. Buckminster Fuller consummates his literary canon, his panoramic lifetime survey of all aspects of the responsibility of human beings for their own destiny. This book is a modern allegory—his long-gestated myth—of the villainy of capitalism and the fecklessness of classic economics. For Fuller, the academic discipline of economics is irrelevant since it derives from an invalid assumption of scarcity.
-
-
Another Bucky classic
- De Hero Health en 04-22-24
-
You Belong to the Universe
- Buckminster Fuller and the Future
- De: Jonathon Keats
- Narrado por: Josh Bloomberg
- Duración: 5 h y 20 m
- Versión completa
-
General
-
Narración:
-
Historia
A self-professed "comprehensive anticipatory design scientist", the inventor Buckminster Fuller (1895-1983) was undoubtedly a visionary. Fuller's creations often bordered on the realm of science fiction, ranging from the freestanding geodesic dome to the three-wheel Dymaxion car to a bathroom requiring neither plumbing nor sewage. Yet in spite of his brilliant mind and lifelong devotion to serving mankind, Fuller's expansive ideas were often dismissed, and have faded from public memory since his death.
-
-
Bucky, Bucky, Bucky
- De Amazon Customer en 08-25-18
De: Jonathon Keats
-
Inventor of the Future
- The Visionary Life of Buckminster Fuller
- De: Alec Nevala-Lee
- Narrado por: Rob Shapiro
- Duración: 18 h y 4 m
- Versión completa
-
General
-
Narración:
-
Historia
During his lifetime, Buckminster Fuller was hailed as one of the greatest geniuses of the twentieth century. As the architectural designer and futurist best known for the geodesic dome, he enthralled a vast popular audience, inspired devotion from both the counterculture and the establishment, and was praised as a modern Leonardo da Vinci. To his admirers, he exemplified what one man could accomplish by approaching urgent design problems using a radically unconventional set of strategies, which he based on a mystical conception of the universe’s geometry.
-
-
I learned much about Buckminster Fuller!
- De Richard J. Chandler en 09-12-22
De: Alec Nevala-Lee
-
FAKE
- Fake Money, Fake Teachers, Fake Assets: How Lies Are Making the Poor and Middle Class Poorer
- De: Robert T. Kiyosaki
- Narrado por: William LeRoy
- Duración: 12 h y 43 m
- Versión completa
-
General
-
Narración:
-
Historia
Robert Kiyosaki - author of the #1 personal finance book of all time - has built a legacy around simplifying complex and often-confusing subjects like money and investing. He continues to challenge conventional wisdom and asks the questions that will help listeners sift through today's information overload to uncover ways to assess what's real... and what isn't. And use truth and facts as a foundation for taking control of their financial lives. In this new book, Robert fights what’s "fake" and helps listeners differentiate between what’s real...and what isn’t.
-
-
Light on the Peanut Butter Heavy on the Crust!
- De Amazon Customer en 05-31-19
-
Beyond Good and Evil
- De: Friedrich Nietzsche
- Narrado por: Alex Jennings, Roy McMillan
- Duración: 8 h y 24 m
- Versión completa
-
General
-
Narración:
-
Historia
Continuing where Thus Spoke Zarathustra left off, Nietzsche's controversial work Beyond Good and Evil is one of the most influential philosophical texts of the 19th century and one of the most controversial works of ideology ever written. Attacking the notion of morality as nothing more than institutionalised weakness, Nietzsche criticises past philosophers for their unquestioning acceptance of moral precepts. Nietzsche tried to formulate what he called "the philosophy of the future".
-
-
Great Book, great Audio Narration
- De Bob H en 01-07-11
-
Walden
- Life in the Woods
- De: Henry David Thoreau
- Narrado por: Alec Sand
- Duración: 10 h y 5 m
- Versión completa
-
General
-
Narración:
-
Historia
Thoreau's classic account of the solitary life, describing his attempts to simplify his life and sort out his priorities by living alone in a cabin beside Walden Pond for nearly two years, is one of the most influential books ever written. The bible of the environmental movement, Walden vividly portrays Thoreau's reverence for nature, and his understanding of the idea that nature is made up of crucially interrelated parts.
-
-
Excellent book and narration
- De Kindle Customer en 06-14-11
-
Grunch of Giants
- De: R. Buckminster Fuller
- Narrado por: Andrew Heyl
- Duración: 3 h y 25 m
- Versión completa
-
General
-
Narración:
-
Historia
With the appearance of Grunch of Giants, R. Buckminster Fuller consummates his literary canon, his panoramic lifetime survey of all aspects of the responsibility of human beings for their own destiny. This book is a modern allegory—his long-gestated myth—of the villainy of capitalism and the fecklessness of classic economics. For Fuller, the academic discipline of economics is irrelevant since it derives from an invalid assumption of scarcity.
-
-
Another Bucky classic
- De Hero Health en 04-22-24
-
You Belong to the Universe
- Buckminster Fuller and the Future
- De: Jonathon Keats
- Narrado por: Josh Bloomberg
- Duración: 5 h y 20 m
- Versión completa
-
General
-
Narración:
-
Historia
A self-professed "comprehensive anticipatory design scientist", the inventor Buckminster Fuller (1895-1983) was undoubtedly a visionary. Fuller's creations often bordered on the realm of science fiction, ranging from the freestanding geodesic dome to the three-wheel Dymaxion car to a bathroom requiring neither plumbing nor sewage. Yet in spite of his brilliant mind and lifelong devotion to serving mankind, Fuller's expansive ideas were often dismissed, and have faded from public memory since his death.
-
-
Bucky, Bucky, Bucky
- De Amazon Customer en 08-25-18
De: Jonathon Keats
-
Inventor of the Future
- The Visionary Life of Buckminster Fuller
- De: Alec Nevala-Lee
- Narrado por: Rob Shapiro
- Duración: 18 h y 4 m
- Versión completa
-
General
-
Narración:
-
Historia
During his lifetime, Buckminster Fuller was hailed as one of the greatest geniuses of the twentieth century. As the architectural designer and futurist best known for the geodesic dome, he enthralled a vast popular audience, inspired devotion from both the counterculture and the establishment, and was praised as a modern Leonardo da Vinci. To his admirers, he exemplified what one man could accomplish by approaching urgent design problems using a radically unconventional set of strategies, which he based on a mystical conception of the universe’s geometry.
-
-
I learned much about Buckminster Fuller!
- De Richard J. Chandler en 09-12-22
De: Alec Nevala-Lee
-
FAKE
- Fake Money, Fake Teachers, Fake Assets: How Lies Are Making the Poor and Middle Class Poorer
- De: Robert T. Kiyosaki
- Narrado por: William LeRoy
- Duración: 12 h y 43 m
- Versión completa
-
General
-
Narración:
-
Historia
Robert Kiyosaki - author of the #1 personal finance book of all time - has built a legacy around simplifying complex and often-confusing subjects like money and investing. He continues to challenge conventional wisdom and asks the questions that will help listeners sift through today's information overload to uncover ways to assess what's real... and what isn't. And use truth and facts as a foundation for taking control of their financial lives. In this new book, Robert fights what’s "fake" and helps listeners differentiate between what’s real...and what isn’t.
-
-
Light on the Peanut Butter Heavy on the Crust!
- De Amazon Customer en 05-31-19
-
Beyond Good and Evil
- De: Friedrich Nietzsche
- Narrado por: Alex Jennings, Roy McMillan
- Duración: 8 h y 24 m
- Versión completa
-
General
-
Narración:
-
Historia
Continuing where Thus Spoke Zarathustra left off, Nietzsche's controversial work Beyond Good and Evil is one of the most influential philosophical texts of the 19th century and one of the most controversial works of ideology ever written. Attacking the notion of morality as nothing more than institutionalised weakness, Nietzsche criticises past philosophers for their unquestioning acceptance of moral precepts. Nietzsche tried to formulate what he called "the philosophy of the future".
-
-
Great Book, great Audio Narration
- De Bob H en 01-07-11
-
Walden
- Life in the Woods
- De: Henry David Thoreau
- Narrado por: Alec Sand
- Duración: 10 h y 5 m
- Versión completa
-
General
-
Narración:
-
Historia
Thoreau's classic account of the solitary life, describing his attempts to simplify his life and sort out his priorities by living alone in a cabin beside Walden Pond for nearly two years, is one of the most influential books ever written. The bible of the environmental movement, Walden vividly portrays Thoreau's reverence for nature, and his understanding of the idea that nature is made up of crucially interrelated parts.
-
-
Excellent book and narration
- De Kindle Customer en 06-14-11
¿Te gustan los libros? Te encantará Audible.
![Transforma tu día](https://m.media-amazon.com/images/G/01/Audible/DesignSystem/Sandbox/Lego/CaptionedImage/captioned-image-07.jpg)
Transforma tu día
Cambia el scrolling interminable por la escucha interminable. Los quehaceres pueden ser divertidos.
![Placeholder Image Alt Text](https://m.media-amazon.com/images/G/01/Audible/DesignSystem/Sandbox/Lego/CaptionedImage/captioned-image-05.jpg)
Escucha en dónde sea
No puedes darle vuelta a la página mientras conduces, pero puedes escuchar
![Placeholder Image Alt Text](https://m.media-amazon.com/images/G/01/Audible/DesignSystem/Sandbox/Lego/CaptionedImage/captioned-image-03.jpg)
Lleva toda tu biblioteca contigo
Tus historias van a donde tú vayas. Los audiolibros viajan ligero.
![Placeholder Image Alt Text](https://m.media-amazon.com/images/G/01/Audible/DesignSystem/Sandbox/Lego/CaptionedImage/captioned-image-06.jpg)
Escucha y aprende
Descubre historias que pueden renovar tu mente, tu bienestar y tu vida.
![Placeholder Image Alt Text](https://m.media-amazon.com/images/G/01/Audible/DesignSystem/Sandbox/Lego/CaptionedImage/captioned-image-08.jpg)
Alcanza tus objetivos de lectura
Descarga títulos para escucharlos sin conexión, en cualquier parte del mundo.
![Placeholder Image Alt Text](https://m.media-amazon.com/images/G/01/Audible/DesignSystem/Sandbox/Lego/CaptionedImage/captioned-image-02.jpg)
Encuentra tu nicho
Con miles de títulos para explorar, hay algo para todos.
Lo que los oyentes dicen sobre Critical Path
Calificaciones medias de los clientesReseñas - Selecciona las pestañas a continuación para cambiar el origen de las reseñas.
-
Total
-
Ejecución
-
Historia
- Michael
- 11-05-22
a redo from an older book
long and drawn out. some chapters better than others and you can skip some
Se ha producido un error. Vuelve a intentarlo dentro de unos minutos.
Has calificado esta reseña.
Reportaste esta reseña
-
Total
-
Ejecución
-
Historia
- Nevets
- 10-23-23
Great Audio get the Book too
all in all a good listen. Fuller is Full of brilliant ideas. he is a humanist utopian idealist no doubt..but his ideas 💡 need to be implemented. yes!
Se ha producido un error. Vuelve a intentarlo dentro de unos minutos.
Has calificado esta reseña.
Reportaste esta reseña
-
Total
-
Ejecución
-
Historia
- RB
- 08-10-22
Usually brilliant
Occasionally accurate predictions and extensive engineering experience in desperate need of an editor. This is a slog to complete. A dense writing style expressing simple ideas, frequently repeated as though for the first time throughout the book.
Like many smart guys in the '70s he thought a one-world government was imminent, and that people with no incentive to work hard mostly will.
Still, he was far ahead of his time in predicting the value of services like Khan academy and universal basic income.
Se ha producido un error. Vuelve a intentarlo dentro de unos minutos.
Has calificado esta reseña.
Reportaste esta reseña
esto le resultó útil a 2 personas
-
Total
-
Ejecución
-
Historia
- John A.
- 10-06-21
A great author
A highly prized book that I think is worth getting through and I recommend it to any serious student.
Se ha producido un error. Vuelve a intentarlo dentro de unos minutos.
Has calificado esta reseña.
Reportaste esta reseña
esto le resultó útil a 2 personas
-
Total
-
Ejecución
-
Historia
- Mark A. Alexander
- 12-28-22
So interestingly dated
This was a fascinating read, and provokes the next round of questions on what he got wrong and what iterations emerge.
Se ha producido un error. Vuelve a intentarlo dentro de unos minutos.
Has calificado esta reseña.
Reportaste esta reseña