087. ARE Technical: Top 5 Tips for Project Management (PjM) Podcast Por  arte de portada

087. ARE Technical: Top 5 Tips for Project Management (PjM)

087. ARE Technical: Top 5 Tips for Project Management (PjM)

Escúchala gratis

Ver detalles del espectáculo
In Episode 87 of the ARE Podcast, David and Eric break down the five most important strategies for passing the Project Management (PjM) division and how to think like a project manager on exam day. We begin with discussing the top five tips for project management, focusing on the AIA Contracts B 101 and A 201, which outline the roles and responsibilities of the owner, architect, and contractor. We emphasize the importance of understanding these documents for both the ARE exam and real-world practice. We also cover accounting in project management, which involves tracking changes and staff utilization, and the nuances of project delivery methods. Additionally, we discuss the differences between owner’s consultants and architect’s consultants, the significance of bonds and insurance, quality assurance and control processes, and the distinction between billable and direct labor rates. Listen to the Audio Show Notes Understanding the AIA Contracts David introduces the episode, focusing on the top five tips for project management, specifically the AIA Contracts B101 and A201.Eric emphasizes the importance of familiarizing oneself with these documents, noting that they are readily available online and through NCARB.David explains the B101 (Owner–Architect Agreement) and its significance in understanding architect services and roles during contract administration.They discuss A201 (General Conditions of the Contract for Construction) as covering applications for payment, schedule of values, and the different ways to handle changes (change orders, CCDs, ASIs). Accounting in Project Management They discuss accounting in project management as different from accounting in practice management.Focus is on: Tracking changes to contracts.Tracking schedules and fees.Staff allocation and hours. David notes it is more staff / personnel related: allocating hours, making sure the team doesn’t exceed budgeted hours.Eric stresses thinking like a project manager, not an employee: Don’t always pick the most “qualified” staff person if their utilization is already very high.Look for underutilized staff and opportunities for mentoring and growth. Project Delivery Methods They review the main project delivery methods: Design–Bid–Build (DBB)Design–Build (DB)Progressive Design–BuildConstruction Manager at Risk (CMAR)CM as Contractor and CM as AgentFast-track as a modifier to multiple methods Eric explains: exam questions are usually asking for the most appropriate method given a specific context, not just “a method that could work.”David notes that for public work, NCARB tends to see Design–Bid–Build as the default because: It is traditional.It supports fairness and transparency. Eric expands on CM at Risk: Contractor is on board early.Provides continuous pricing and helps maintain a GMP.Good for complex projects and for controlling cost and risk. They briefly mention Integrated Project Delivery (IPD) as an advanced form often used for highly complex buildings (e.g., labs). Owner vs. Architect Consultants Architects’ typical consultants: Mechanical, electrical, plumbing engineers.Structural engineer.Landscape architect. These are architect’s consultants: Their fees are included in the architect’s proposal.Architect manages and coordinates them. Owner’s consultants (e.g., AV consultant, security consultant, drapery consultant): Hired and paid directly by the owner.Architect still must coordinate their work with the project, but does not manage them. David gives the example of a drapery consultant: Architect provides floor plans, door/window schedules, head and jamb details.Architect is not calling to check orders, delivery, and installation—that is the owner’s role. Under B101, MEP and structural are part of the architect’s basic services, even though the actual work is done via consultants. Bonds and Insurance Eric frames bonds as a form of insurance for the owner.Key bond types to know: Bid Bond – assures the contractor will honor its bid.Performance Bond – assures the contractor will complete the work per contract.Payment Bond – assures subs, suppliers, and labor are paid. Many other bond types exist, but exam focus is on the major ones.David notes that under B101, the architect typically carries five types of insurance: Workers’ compensationAutomobile insuranceProfessional liability insuranceGeneral liability insuranceEmployers’ liability insurance (added in 2017) Distinction between: What states require (e.g., only workers comp and auto in some states).What B101 contractually requires if not amended. Quality Assurance (QA) and Quality Control (QC) QA/QC processes in offices: Checklists, internal reviews, “red team” reviews.Standard procedures to ensure a consistent standard of care. For complex projects (e.g., with specialized or “wacky” equipment): Extra coordination, double- and triple-checking.Use of equipment/...
Todavía no hay opiniones